RSS

Mission No. Aborted – December 18, 1944


Target: Front Line Support for American 1st Army
Bomb Load: 12-500# G.P.
Gas Load: 2400 gallons
Briefing: 0715
Plane: F4213 – Rubble Rouser
Position: #2, #4 Element, Lead Sqdn., 41st “B” Gp.
T.O.: 0959 Land: 1412 Time: 4 hours, 13 minutes
Left Base: 1044 @ 13000′
Bombs Away: Jettisoned in Channel
Distance: 473 SM

Remarks: Reached Belgium coast without trouble. Five minutes after crossing coast had to feather #2 engine because of internal failure.  Unable to climb or stay with group so turned back.  Five minutes later had to feather #1 engine because of internal failure.  Jettisoned bombs in Channel and returned to base without further trouble. Pilot made beautiful landing under the circumstances.  Very disappointed.  Would have been a very nice mission.

[Note: This was the 379th Bomb Group’s 231st mission.]

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

 
%d bloggers like this: